ABM SOLID
PL EN

Structures od Roadworks and Bridges


Steel structure of two bridge objects in Czarnowąsy
Investor: Nowak-Mosty Sp. z o.o.

                 

Structure of road flyover in Radom
Investor: Dragados S.A.

                 

Steel structure of a bridge in Ostrowia Mazowiecka
Investor: POLAQUA Sp. z o.o.

           

Footbridge in Jaworniki
Investor: REMOST s.c.

       

Manufacture and assembly of steel bridge objects in Lipsk
Investor: Strabag Sp. z o.o.

                 

Steel structure of a railway bridge (Warszawa-Terespol)
Investor: INTOP WARSZAWA Sp. z o.o.

     

Road bridge over Dunajec River in Stary Sącz bypass
Investor: Zakład Robót Mostowych

       

Road bridge in Laskowa
Investor: Zakład Robót Mostowych

     

Erection of the rail bridge in Rybnik
Investor: Zakład Instalacji Sanitarnych i Robót Inżynieryjnych

     

Building the L class road with road bridge in 25+800 km of the Skawa river in Mucharz Community, Wadowice County, Małopolska Region, as a part of the project “Building water reservoir Świnna Poręba on the Skawa river”.
Investor: Regionalny Zarząd Gospodarki Wodnej w Krakowie

     

Building railway bridge truss in about Biala Podlaska line Warsaw - Terespol
Investor: Przedsiębiorstwa Robót Kolejowych i Inżynieryjnych S.A.

   

Project, creation and final assembly of the steel structure of silo depot for KHS KROSNO S.A.
Investor: KHS KROSNO S.A.

     

Creation and final assembly of steel absorber, exhaust gas tubes and cascade installation for desulfurization exhaust gas in Strzyżów Sugar Refinery.
Investor: Cukrownia Strzyżów S.A.

   

Production line no 9 assembly with enlargement of the facility in Brzesko
Investor: CP RE Sp. z o.o.

     

Crane beam for the expansion of the hall in CMC Zawiercie SA
Investor: CMC Zawiercie SA.

 

Fabrication and assembly of the temporary bridge steel construction over railway in Włoszczowa.
Investor: PKP PLK S.A.

 


 

Fabrication and assembly of the steel construction of the bridge WK-432 in the frames of A1 highway on the Pyrzowice - Piekary Śląskie section.
Investor: GDDKiA Oddział w Warszawie

Bypass Pruszcz Gdansk, Old Bridge on the River Radunia. Trestle bridge over the railway station.
Investor: Strabag Sp. z o.o.

The design truly convenient .
Investor: POLWAR S.A.

The construction of the viaduct. A4 motorway section Wierzchosławice - Krzyż.
Investor: Dragados S.A. and IMB Podbeskidzie Sp. z o.o.

Bridge in Hoczew.
Investor: Mota-Engil Central Europe S.A. i Stalmost Sp. z o.o.

Fabrication and assembly of the temporary bridge steel construction over railway in Braniewo.
Investor: ITA Sp. z o.o.

Temporary construction of 13.2 m.
Investor: PKP Polskie Linie Kolejowe S.A.

The construction of the bridge over the river Łydynia in Obrąb.
Investor: Przedsiębiorstwo Budownictwa Lądowego

mplementation of 8 pcs of temporary structures on the line 4 - E65 Grodzisk Mazowiecki - Zawiercie.
Investor: PKP Polskie Linie Kolejowe S.A. Oddział w Lublinie.

Temporary construction.
Investor: ITA Sp. z o.o.

Fabrication and assembly of the steel construction of the flyover over the railway and the bridge over Stara Radunia river in the frames of Pruszcz Gdański bypass.
Investor: Gmina Miejska Pruszcz Gdański